He extra that Period two would include the stretch from the Lekki 2nd toll gate into the Ajah beneath-bridge and could well be divided into 4 sections. “Motorists from Ajah inward Lekki will be diverted to at least one lane though repairs are ongoing on one other lane,” Osiyemi said. https://douglasr975oty9.eqnextwiki.com/user