The very first park has a ability of 200 MW though Sandrini II incorporates a potential of 100 MW. The entire cost of both equally projects weren't disclosed on the other hand, for the duration of development, around 200 workers ended up used. The tasks are envisioned to check out https://solarcompanyvisaliaca.blogspot.com/2024/11/4-tips-to-pick-right-solar-panel.html